The forge line

Eleven steps.
One heat number.

Follow a single part from raw bar to dispatch. Every step below happens in our own plants, under one quality system, with the part traceable the whole way.

Scroll to move the part along the line

01/ 11
Part temperature 20°C
Illustrative thermal profile

Raw material storage

Every bar enters with a heat number, the thread that ties the finished part back to its steel.

Heat number at intakeTraceable to dispatch

Raw material inspection

Incoming bars are inspected before they are released to the line.

Incoming inspectionReleased to line

Lab inspection

The metallurgical lab checks phase, grain size, inclusion rating and decarburisation, with grain-flow, step-down and upsetting tests, on a microscope, Jominy tester and spectrometer.

SpectrometerJominy testerRockwell & Brinell

Cutting

Bars are cut to the billet length the part needs, ready for the furnace.

Cut to billet length

Forging

Hammer forging handles parts from 1 kg to 60 kg. Upsetter forging has no weight limit, only a size limit: flange diameters of up to 420 mm. Presses go up to 2,500 tonnes. The billet leaves as a part.

Hammers 1–3 TUpsetters 2″–10″Presses 1,000–2,500 T

Part inspection

Forged parts are checked before they move on. Magnetic particle inspection covers every forging for cracks, on a 1.2 m bed with a 5,000 A dual-shot system.

100% MPI5,000 A dual shotDefect-free to machining

Heat treatment

Continuous gas-fired (2 T/hr) and oil-fired (1 T/hr) furnaces, SCADA-controlled and fully automated, run normalising, quench and temper, and isothermal annealing. Five automatic shot-blasting machines then remove scale.

SCADA-controlledQ&T · normalise · isothermalCQI-9 assessed

Machining

CNC, VMC, HMC and VTL machining, broaching, gear hobbing, gun drilling and cylindrical grinding, across more than 120 machines in two machining facilities.

120+ machinesCNC · VMC · HMC · VTLGrinding to 800 mm

Standard room

A climate-controlled metrology room: CMM, gear tester, surface-roughness tester and master gauges, with full traceability.

CMMGear testerMaster gauges

Final inspection

Structured APQP, PPAP Level 3, SPC on critical-to-quality characteristics and annual MSA decide whether a part ships.

APQPPPAP Level 3SPC · MSA

Packing & dispatch

Each part is wrapped in protective bubble sheet, boxed, taped and strapped for export, then dispatched with its record intact: heat number to dispatch, every time.

Export-grade packingHeat no. to dispatchIATF 16949 · ISO 9001
Under one roof

Forge to finish.
Every step, every check, every time.

Design, forging, machining and inspection sit inside one group and one quality system. That is how a new part launches faster, and how a part from last year and a part from today stay the same part.

See the equipment behind the line

Ready when you are

Send us
a part.

Share a drawing, a weight and a volume. We will map it onto this line.

See the products

Request for quotation

Tell us about the part.

Step 1 of 3

What do you need from us?
The part
How do we reach you?

Received

Thank you. Our engineers will reply within two working days.

If your email app did not open, copy the summary below and send it to info@ambargroup.co.in.